The installation was carried out on December 24, 2020.

The installation of the pilot required mechanical works that were performed by a specialized company following the instructions of the mechanical department of AEInnova.

The final installation of the recovery system was performed jointly with the staff of AEInnova and Distiller.

Below you can see some of the photographs taken at the installation.